Service Locations
Expanded Service Area
Home / Construction & Installation / Project Portfolio
We look forward to assisting you
Titan Power recently completed a critical data center upgrade for a prominent retail company. As part of this project, we replaced four legacy Power Distribution…
Titan Power recently completed a critical upgrade at a major healthcare datacenter, where aging Uninterruptible Power Supply (UPS) systems were in need of capacitor, fan,…
Titan Power recently played a pivotal role in upgrading the air conditioning systems of one of Arizona’s largest specialty retailers! Our team successfully coordinated the…
Titan Power successfully executed a UPS replacement and start-up project for one of Arizona’s largest healthcare facilities. This specialized solution ensures uninterrupted operation of vital…
University of Arizona Uninterruptible Power Supply Titan Power coordinated the delivery/rigging and assisted in the electrical installation of an 825kVA Eaton Powerware 9395 Uninterruptible Power…
University of Arizona Computer Center UPS Installation Titan Power installed a Three Phase 500kVA Uninterruptible Power System to back up power of the University of…
Titan Power provided project management for the ASU Help Desk call center location in Tempe. This included requesting and getting electrical engineering and city permits….
Titan Power built the back-up power system for the administrative offices of Hospice of the Valley in Phoenix, AZ. Titan Power provided comprehensive project management…
Titan Power built the back-up power system for the newly built administrative offices of Ironwood Cancer Center in Gilbert, AZ. We provided comprehensive project management…
Titan Power was awarded a design/build contract for the building foundation, backup power and air infrastructure for an 8,000 square foot data center and adjacent…
Titan Power designed and built a new Data Center in Scottsdale, AZ. This Data Center included a Parallel 500kVA UPS Systems with A & B…
Before & After Pictures – Titan Power provided and installed a new concrete slab and enclosure, ATS, step down transformer and electrical connections for customer…
Titan Power provided project management to Cliff Castle Casino located north of Phoenix to install and replace an emergency generator system. Titan Power installed three…
Titan Power replaced the existing generator and UPS with all new upgraded equipment. A chemical fire suppression system was created and installed, and two Computer…
Titan Power provided and electrically wired a new Natural Gas Generator and an Automatic Transfer Switch. This furnishes backup power to the existing building’s power…
Titan Power provided ASU with an 800kW rental generator for back-up power during their 6-week, Fall 2011 registration period. The generator is located alongside Palm…
Titan Power installed an Emergency Power System for the facility that included a 1750kW Generator and two (2) 1600 Amp Automatic Transfer Switches. This project…
Titan Power provided and installed a Kohler outdoor 155kW Diesel Generator with 400amp ATS switch with nema 3R enclosure. Additionally, Titan Power installed a Liebert…
Titan Power recently completed a critical upgrade at a major healthcare datacenter, where aging Uninterruptible Power Supply (UPS) systems were in need of capacitor, fan,…
Titan Power successfully executed a UPS replacement and start-up project for one of Arizona’s largest healthcare facilities. This specialized solution ensures uninterrupted operation of vital…
University of Arizona Uninterruptible Power Supply Titan Power coordinated the delivery/rigging and assisted in the electrical installation of an 825kVA Eaton Powerware 9395 Uninterruptible Power…
University of Arizona Computer Center UPS Installation Titan Power installed a Three Phase 500kVA Uninterruptible Power System to back up power of the University of…
South Mountain Community College Gamatronic Installation Titan Power replaced the current Powerware 20kVA UPS with a new Gamatronic RM100 wired for 70kVA with n+1 redundancy….
Titan Power replaced the existing generator and UPS with all new upgraded equipment. A chemical fire suppression system was created and installed, and two Computer…
Titan Power was awarded the contract to supply and install an advanced server cooling solution for a major University in California. The bid requirements were…
Titan Power removed (2) 22 ton CRAC units and their associated condensers and replaced with (2) new 25 ton Stulz CRAC units. This project included…
Titan Power was awarded the contract to provide and install (2) two Liebert DS Computer Room Air Conditioning (CRAC) units on the Data Center floor…
Titan Power built the back-up power system for the newly built administrative offices of Ironwood Cancer Center in Gilbert, AZ. We provided comprehensive project management…
Titan Power replaced the existing generator and UPS with all new upgraded equipment. A chemical fire suppression system was created and installed, and two Computer…
ASU Starline Track Busway Installation Titan Power furnished and installed Starline Track Busway and ladder rack to distribute power overhead from ASUs Uninterruptible Power Supply…
ASU Polytechnic – Fire Suppression & Power Distribution Titan Power provided ASU the design and installation of a clean agent fire suppression system, which included:…
Titan Power provided project management for the ASU Help Desk call center location in Tempe. This included requesting and getting electrical engineering and city permits….
Titan Power built the back-up power system for the administrative offices of Hospice of the Valley in Phoenix, AZ. Titan Power provided comprehensive project management…
Titan Power built the back-up power system for the newly built administrative offices of Ironwood Cancer Center in Gilbert, AZ. We provided comprehensive project management…
Titan Power replaced the existing generator and UPS with all new upgraded equipment. A chemical fire suppression system was created and installed, and two Computer…
Service Locations
Expanded Service Area
Useful Links
Contact Information