Maricopa Community Colleges (Phoenix Location)

Maricopa Community Colleges (Phoenix Location)

We look forward to assisting you

Receive a free consultation. Use the form below or call our 800-509-6170 today

Maricopa Community Colleges (Phoenix Location)

Before & After Pictures – Titan Power provided and installed a new concrete slab and enclosure, ATS, step down transformer and electrical connections for customer provided generator. In the data room, Titan Power provided and installed several Liebert Data Mate CRAC’s, Starline Busway power distribution Gamatronic UPS, six (6) racks and fire suppression system. Project completed on time and within budget.

More Projects

Titan Power recently completed a critical data center upgrade for a prominent retail company. As part of this project, we replaced four legacy Power Distribution…

Titan Power recently completed a critical upgrade at a major healthcare datacenter, where aging Uninterruptible Power Supply (UPS) systems were in need of capacitor, fan,…

Titan Power recently played a pivotal role in upgrading the air conditioning systems of one of Arizona’s largest specialty retailers! Our team successfully coordinated the…

Titan Power successfully executed a UPS replacement and start-up project for one of Arizona’s largest healthcare facilities. This specialized solution ensures uninterrupted operation of vital…

University of Arizona Uninterruptible Power Supply Titan Power coordinated the delivery/rigging and assisted in the electrical installation of an 825kVA Eaton Powerware 9395 Uninterruptible Power…

University of Arizona Computer Center UPS Installation Titan Power installed a Three Phase 500kVA Uninterruptible Power System to back up power of the University of…